Irrigation scheduling with subsurface drip uses the same methods of calculation as above-ground irrigation. The subsurface grid system is designed to wet the irrigated area completely by methods similar to those used in above-ground irrigation, supplying water in inches per hour. For efficient water application, it is necessary to apply water rates equal to or less than the rate at which the plants use water (evapotranspiration rate; ET). The ET rate is expressed in inches per unit of time, thus our application rates are expressed in inches per hour. (For regional ET data, refer to the Toro Rainfall and Evapotranspiration Data Book, Form No. 490-1358.)

The following formula is used to determine application rates for subsurface drip irrigation.

Application rate (inches per hour) = 231.1 x Emitter flow (GPH)
Dripper spacing x Dripline spacing (in inches)

For example: Dripline row spacing = 12"
DL2000 emitter spacing = 12"
Emitter flow rate = .53 GPH
231.1 x .53 GPH = 0.85 inches per hour
12 (inches) x 12 (inches)

Or, use the Water Application Rate Table below to determine application rates.

TABLE 3.1
WATER APPLICATION RATE IN INCHES PER HOUR @ 20 PSI
  Item Number Flow Rate Dripline Spacing
12" 15" 18" 24"
Pressure-Compensating RGP-212-01 0.53 GPH 0.85 0.68 0.57 0.43
RGP-212-03 0.53 GPH 0.85 0.68 0.57 0.43
RGP-212-10 0.53 GPH 0.85 0.68 0.57 0.43
RGP-218-01 0.53 GPH 0.57 0.45 0.38 0.28
RGP-218-03 0.53 GPH 0.57 0.45 0.38 0.28
RGP-218-10 0.53 GPH 0.57 0.45 0.38 0.28
RGP-224-03 0.53 GPH 0.43 0.34 0.28 0.21
RGP-224-10 0.53 GPH 0.43 0.34 0.28 0.21
RGP 412-01 1.02 GPH 1.64 1.31 1.09 0.82
RGP 412-03 1.02 GPH 1.64 1.31 1.09 0.82
RGP 412-10 1.02 GPH 1.64 1.31 1.09 0.82
RGP 418-01 1.02 GPH 1.09 0.87 0.73 0.55
RGP 418-03 1.02 GPH 1.09 0.87 0.73 0.55
RGP 418-10 1.02 GPH 1.09 0.87 0.73 0.55
RGP-424-03 1.02 GPH 0.82 0.65 0.55 0.41
RGP-424-10 1.02 GPH 0.82 0.65 0.55 0.41
Non-Pressure-Comp. RGN 212-05 0.62 GPH 1.00 0.80 0.66 0.50
RGN 218-05 0.62 GPH 0.66 0.53 0.44 0.33
RGN 412-05 1.08 GPH 1.73 1.39 1.16 0.87
RGN 418-08 1.08 GPH 1.16 0.92 0.77 0.58
Microline MCRG-206 0.62 GPH 3.98 1.99 1.33 1.00
MCRG-212 0.62 GPH 1.99 1.00 0.66 0.50

Zone Run Time Scheduling Worksheet

To determine zone run times, obtain the following information:

n monthly evapotranspiration value for the location

n irrigation application rate
(For regional ET data, refer to the Toro Rainfall and Evapotranspiration
Data Book, Form No. 490-1358
.)

The following formulae can be used to determine run times.

Run time per week = Weekly evapotranspiration rate
Application rate

 

Run time per day = Run time per week
Days per week


TABLE 3.2
MONTH:
ZONES
DAY 1 2 3 4 5 6
Sun.            
Mon.            
Tues.            
Wed.            
Thurs.            
Fri.            
Sat.            
* The number of zones may vary depending on the specific needs of each installation.

Controller Training Programs

 

Interactive GEO Controller Training Program

This is a .zip file and may take a few minutes to download

 

 

 

Printed GEO Controller Training Program

Print this out and work through it at your controller